Par alma7178
23 novembre 2020
Botched our subfloor installment and would not respond to us to come back to fix it. We contacted him several times. He was supposed to do further work for us and we decided to go elsewhere. Did not even screw the planks into the floor joists and they just lifted. Went over existing gaps without adding supports. Left no space between planks to allow for temperature changes so they just bubbled.
>
Signaler
Vous êtes le proprio? Répondez ou Contactez PJ